Importing custom wooden games from China is a sequence of six decisions, and each one is cheap to get right and expensive to get wrong. Most import failures are not caused by a bad factory – they are caused by a step being skipped because it looked like a formality.
The six steps are: verify the supplier, fix the specification and the quote, run the sample properly, settle certification, choose the Incoterm and the classification, and structure payment so that the deposit buys production rather than a promise.
Here is each step, with the specific failure it prevents.

Why China for Wooden Games
The advantage is not cheap labour, and framing it that way leads buyers to the wrong suppliers.
The real advantage is that the whole chain sits in one place: timber yards that stock and dry the species you need, CNC and turning shops, coating lines set up for volume, and packaging printers who understand retail cartons. In Guangdong and Zhejiang a buyer can move from a drawing to a finished retail-ready product without the components travelling far.
The second advantage is export familiarity. Factories that ship to Europe and North America already know the standards, the documentation and the freight process, which means they are not learning on your order.
The disadvantage is that the same concentration makes it easy to end up with a trading company that presents as a factory. That is what step one exists to prevent.
Step 1: Find a Supplier You Can Verify

Three channels, in order of usefulness.
- Trade shows. Canton Fair in Guangzhou (April and October) for breadth; category shows such as Spielwarenmesse in Nuremberg or Ambiente in Frankfurt for relevance. The only channel where you can see a sample, meet the maker and assess the company in one conversation.
- Industry directories. Made-in-China and Global Sources skew towards exporters with documentation, which is a useful filter when certification matters.
- Regional search. Searching by manufacturing region rather than by platform usually produces a better price, because no platform fee sits inside the quote.
Then verify, in this order: check the registered business scope on the licence; ask for a live video walkthrough of the floor; ask who owns the finishing line; and ask for two references in your market. A company registered for trade is a trading company – not disqualifying, but it changes where the margin sits.
Step 2: Set the Minimum and Get a Comparable Quote
A high minimum is a statement about the factory’s cost structure, not about your order. Setup – tooling, programming, a first-article check – has to be amortised, and at 5,000 units it disappears into the unit price while at 300 it does not.
500 sets is roughly where setup is covered and the per-unit price still competes with a stock item. That is why it is a common minimum for custom wooden games, and it is low enough to test a design before committing to container volume.
On price, the productive move is not to open with a claim that the price is too high. It is to fix the specification first, then ask for the quote itemised – material, machining, finish, branding, packaging and Incoterm as separate lines – and negotiate on the element that actually has room, usually packaging or branding setup rather than the material.
What is genuinely negotiable: payment schedule, inspection rights, the starting point of the delivery date, and volume tier breaks. What is not: the cost of material at a given grade. A supplier who drops the price significantly without a specification change has changed something you cannot see.
Step 3: Run the Sample Properly
The sample is not a preview. It is a test of whether the factory can hold a specification, and most buyers run it as the former.
What the specification has to contain, in writing:
- Dimensions with units, and the tolerance that matters – usually thickness on any stacking product.
- Species and grade, named rather than described.
- Finish system by product name, not by appearance. “Matte, open-grain, hardwax oil” rather than “natural”.
- Hardware specification for anything that stays outdoors – stainless or galvanised.
- Packaging: carton type, printing, inserts, rules card, barcode and compliance marks.
- Quantity, target market and target retail price. The retail price determines which construction is viable.
Then check three things on arrival: whether the edges and recesses are clean enough that a child could not pick up a splinter; whether the piece has the mass the specification implied; and whether the colour matches the approved sample rather than approximately matching it.
Two more tests cost almost nothing. Ask whether the sample was built on the production line or by hand – a bench sample does not predict the order. And order a second sample from a different batch; if the two differ in species, tone or thickness, the factory cannot hold a specification.
Standard samples take 5–10 days to produce plus 3–7 days in transit, with the charge credited against the order.
Step 4: Settle Certification Before Production

A wooden game for children in the EU falls under the Toy Safety Directive and the EN71 series: EN71-1 for mechanical and physical properties, EN71-2 for flammability, EN71-3 for heavy metal migration from coatings. CE marking is the manufacturer’s declaration of conformity supported by a technical file, not a certificate issued by the EU.
In the United States, ASTM F963 sets the toy safety specification, and CPSIA adds lead and phthalate limits, third-party testing, a Children’s Product Certificate and permanent tracking labels on the item as well as the packaging.
Two clarifications worth having. FSC is a chain-of-custody system for timber sourcing – it says nothing about product safety, and a product can be FSC-certified and still fail EN71 on a coating. ISO 9001 is a quality-management certificate: a useful signal about how the company is run, not evidence about the goods.
Testing typically takes 5–10 working days from receipt of samples. Start it when the sample is approved, in parallel with production, and it stays off the critical path.
Step 5: Incoterms, Classification and Transit
- FOB – the supplier delivers to the port and you arrange freight. Cheapest, and requires you to have a forwarder.
- CIF – the supplier arranges freight and insurance to your port. Simpler, and the cost is inside the quote rather than visible.
- DDP – delivered duty paid, to your door. The simplest and the most expensive, and worth it for a first order where the import process is unfamiliar.
On classification: do not take an HS code from a supplier without checking it. Ask your customs broker to confirm the code for the specific product, because the code drives the duty rate and an incorrect one can hold a shipment for weeks while storage and demurrage accrue to the importer.
Transit is roughly 30–40 days to Europe and 14–25 days to the US west coast, plus port handling at both ends. Production is 30–45 days from deposit and sample approval. Working backwards from a shelf date is the only reliable planning method.
Step 6: Payment and Inspection
- Never pay in full upfront. The normal structure is a deposit against production and the balance against the bill of lading or after inspection.
- Pay the company, not the person. The bank account name must match the company name on the contract and the licence. A request to pay a personal account is a red flag regardless of the explanation.
- Use a documented channel for a first order – trade assurance or a letter of credit – and move to direct transfer once there is a track record.
- Book an inspection before shipment for a first order. A third-party inspector checking against your written specification catches the batch-level problems – colour variation, dimensions, finish – that a sample cannot.
The Mistakes That Cost the Most
- A quote far below the others. It usually has something removed: thinner boards, a cheaper species, one coat instead of three, no edge sealing. The comparison to make is against an itemised quote, not against a total.
- No delivery date in the contract. A date with a starting point and a consequence is enforceable. “About a month” is not.
- Forgetting the factory calendar. Chinese New Year and the first week of October each remove two to three weeks from the year.
- Underestimating the landed cost. Freight, duty, port charges and inland delivery are not in the unit price, and they change the margin calculation.
- One supplier. A second qualified source costs a sample and a fortnight to establish, and it is the cheapest insurance available.
Conclusion
Importing is a verification process rather than a purchasing process. Verify the supplier before the sample, fix the specification before the quote, test the sample for consistency rather than for appearance, settle certification before production, and structure payment so the deposit buys production.
None of those steps is difficult. They are simply the ones that get skipped when a quote looks good, and they are the ones that decide whether the container is an asset or a problem.
Importing wooden games from China?
We manufacture direct in Guangzhou: 500-set minimum, quotes within 24 hours, samples in 5–10 days, production in 30–45 days, EN71 and ASTM F963 compliance, FSC-certified timber. Licence copy and workshop video call on request: contact us
FAQs
1. What is the average lead time for custom orders?
Production runs 30–45 days from deposit and sample approval. Sampling adds 5–10 days plus transit, and ocean freight adds 30–40 days to Europe or 14–25 days to the US west coast.
2. Can I order less than 500 sets?
Below a few hundred sets the setup cost per unit rises to where the price stops competing with a stock item. At that point the better decision is usually to wait and order at a volume that works rather than to order small and lose the margin.
3. How do I check quality without visiting China?
A live video walkthrough, a sample confirmed as production-line rather than bench-built, a second sample from a different batch, and a third-party pre-shipment inspection against your written specification.
4. Which Incoterm should a first order use?
DDP if the import process is unfamiliar and the simplicity is worth the cost. FOB once you have a forwarder, because it makes the freight cost visible and comparable.
5. Do I need an import licence?
In the United States, generally no for this category, but requirements vary by destination and by product classification. Confirm with a customs broker in your market before the goods ship rather than after.
Sourcing Wooden Garden Games in Bulk?
Kangjie is the direct manufacturer behind these games — no trading company, no middleman margin. We supply Kubb, Croquet, Molkky, Ring Toss, Tumble Tower, Cornhole and more to importers, retailers and brand owners worldwide.
- Factory-direct pricing with transparent volume tiers (500 / 1,000 / 5,000 units)
- OEM & ODM: logo, packaging, size and finish built to your specification
- EN71 & ASTM F963 compliant; FSC-certified timber
- Bulk lead time 30–45 days, quotation within 24 hours